Technical Manuals:
"Double Wall"
"Floor Slab"

1994 Foundation by Christian Prilhofer
1995 Planning and building of two closed-circuit production lines for the production of solid wall elements for prefabricated and multi-storey homes.
1996 Plant for the production of floor slab elements and balconies. 7 staff (incl. forklift driver and foreman) produce 1225 m² floor slab elements and balconies in 8 hours.
1997 Plant for the production of solid walls and floor slabs. Output per shift approx. 500 m²
1998 Combined plant for the production of floor slab elements and double wall elements in Belgium Output per hour approx. 180 m² concreted area (approx. 50% floor slabs &. 50% double walls). Hourly value approx. 0,1 man-hours per m² cast area.
Application of a CAD/CAM controlled mesh reinforcement plant for the production of sandwich elements and special parts for industrial construction, max. individual component weight 32 t.
1999 Establishment of a second office in Thalheim/Wels, Austria
1999 Plant for the production solid walls and special parts. First separation of processing- and transfer layers. First flexible concept with a high degree of automation
2000 Combined plant for the production of wall elements for the construction of houses. High degree of automation. Operator: Construction firm specialised in single occupancy houses.
2001 Development of a small plant with 3 variants. This plant has hourly values, which are comparable with those of a commercial sized installation. Investment costs are in relation to the plant’s output and are also comparable with those of the highest performance plants.
2002 Combined plant for all areal products such as floor slabs and walls as partly precast and solid elements in Sweden
2003 Combined plant for all areal products such as floor slabs and walls as partly precast and solid elements for houses and industrial buildings in Ireland
2004 Plant for 110.000 m² solid walls per month for the construction of villas in Bangkok, Thailand. Successful start-up in December 2004
2005 Multi-function plant for the production of buildings with a patented steel frame and concrete structure as well as production of double and solid walls and floor slabs in Dubai / U.A.E.
2006 Planning of a state-of-the-art precast component plant – the first CAD/CAM-controlled precast component plant in Saudi Arabia
2007 Plant for the production of wall elements including façade, windows and doors
2008 Completion and start-up of a precast factory in Saudi Arabia with CAD/CAM controlled pallet circulation and mesh welding system, production area for special elements and hollow core line.
2009 Completion and start-up of a precast factory in the UK with 5 production areas
2009 Completion of a precast factory for the production of low cost housing – 40 units per day – in Mexico