Environment
- Sustainable - concrete is a natural building material, 100% recyclable
- Reduction of squandering of energy, water and building material
- Very low waste in the production process
- Reduced packaging materials
- After demolishing of a concrete building the material such as concrete and steel reinforcement can be recycled and reused in new buildings
Economic
- Fix price and fixed hand-over date
- Short-time erection - less costs for financing and for site equipments
- Industrialised building - less supervision, less crafts, less coordination
- Precise reinforcing during prefabrication saves steel and ensures exact rebar figures
- Precise consumption of all material used (cement, steel etc.) - pre-fabrication in a factory -controlling
- No maintenance of the building necessary
Quality
- High quality: Pre-fabrication independent of weather conditions
- Highest precision and quality of the concrete elements
- Best quality due to the quality control in the precast concrete plant
- Best possible fire resistance without additional efforts
- High noise protection and best thermal behaviour
- Low moisture content in the finished building
Design
- Optimized exploitation of living area - slim construction wall elements
- No constraint of architectural design
- High quality of precast elements save costs for plastering, only joint filler and paint or wall paper required
- Concrete gives a versatile and durable façade with all possible finishes and colours
Construction
- Accurate production guaranteed by factory environment
- Load-bearing walls substitute frame or skeleton structures which is a cost reduction
- High grade of in-factory completed embeds (pipes, conduits, electric boxes etc.) reduces the time of assembly and completion on the building site
- Earthquake-resistant building system
The final result of this technology is comparable to concrete in-situ constructions and for the engineers easy to understand and to handle
Assembling
- Shortest assembling of the construction on site, reduces the period of disturbance for adjacent residents
- Pre-fabricated elements can be stored and delivered according to the work flow on the construction site
- No scaffolding, only temporary props for pre-fabricated products required