Public buildings built with precast concrete elements
From hospital to soccer stadium
Compared to other building types, public buildings have an additional requirement: they are funded by public authorities and therefore need to set an example. Hence, in many countries there is a special focus on energy-efficient construction and life cycle management.
Use the great flexibility of precast concrete elements
Precast concrete buildings do not have any limitations regarding their utilization. Hospitals, schools, stadiums and administration buildings can be built. Large spans can be achieved with pre-stressed floor elements, which provides a high flexibility of the floorplan.
Cost-efficient individuality without quality losses
Modern precast concrete production can produce individual wall elements in a cost-efficient way. Individual wall elements are elements which differ in dimension and shape. An individual design of facades and ground plots can be achieved with precast concrete elements without any additional costs.